In 2018, DMH Plant assisted with a full Wash Plant decommission in Bristol and reinstallation at the WHBM site in Wiltshire.
You may also like
2 weeks to put this equipment right once it had been removed from the drink after Cofferdam burst.All systems flushed and electrics cleaned, […]
Had an urgent job to remove overhaul and replace the transmission on a CAT 950K onsite for a client based in Wiltshire. […]
Caterpiller D6T overturned on site !
Client based in Northampton required a 2000 hour service on the Caterpiller D6N bulldozer to meet the manufacturers service requirements. All filters and […]